DSR PUNE 2012-13 PDF

1GENERAL NOTES Schedule of Rates is prepared for the year Operative from 1st Oct. and is applicable for P.W. Circle. Pune. This annual Progress Report for the year includes the important programmes and .. These are located in Mumbai (41), Thane (9) and Pune (38) district. These functioning .. DIC, Kolhapur DSR yet to be submitted. Dsr Pwd. Mumbai. Jun 19, -. PWD MAHARASHTRA. DSR. 17 Pune PWD DSR |. Deep dsr pune 13 pdf – dsr.

Author: Jujin Jujinn
Country: Kazakhstan
Language: English (Spanish)
Genre: Love
Published (Last): 19 October 2015
Pages: 326
PDF File Size: 10.74 Mb
ePub File Size: 13.78 Mb
ISBN: 973-9-73866-686-9
Downloads: 48799
Price: Free* [*Free Regsitration Required]
Uploader: Kazradal

Department vide letter No. Instead the concerned Executive Engineer shall approve the mix design by taking into consideration necessary parameters. Pwd dsr pune 13 pdf – dsr pune 13 pdf Statement A-1 – Material Master. Tgs mklh dsr dsr pendidikan kel. Rubble, Metal, Sand, Murum etc.

Pipes, Pre stressed concrete pipes, A. B Mild Steel Rs.

The increase in rates as above should be on ground floor basic rates only. Department vide letter No. In case the quantity is more than Cu. No cumulative increase shall be done.

dwr

pwd_civil_works_rate_analysis

If such documentary evidence is not produced the component of Royalty charges as contemplated in the item shall not be paid to Agency. Pipes, cement blocks, steel, tar bitumen, roofing felt, floor asphalt, steel, mating, bamboos and Ballies of all size, ceiling board, rubber P. For following items of Bridge works the separate rate analysis shall be approved by the Territorial Superintending Engineer: Agency will have to produce documentary evidence to the concerned Executive Engineer, as regards payments made by Agency to Revenue Department towards royalty charges.

  LA GUERRA DE LOS YACARES HORACIO QUIROGA PDF

Directorate punf Insurance Maharashtra State vide letter No. Pipes, Pre stressed concrete pipes, A. Statement A-1 – Material Master.

Rabtab DSR

The increase in rates as above should be applicable only one at a time e. The same should be added in the rate analysis while framing the estimate and the amount shall be deducted from contractors bills pue prescribed in the said G. R; which includes all taxes such as excise, CST, Terminal tax, vat,educational tax etc.

In case the quantity is more than Cu. Copy attached in Pg. Copy of Notification attached. C Tor Steel H. Actual lead charges are to be added for these supply items. However in case the rates are revised by Revenue and Forest Department time to time, the difference may be considered while preparing Estimate. Refinery Mumbaib The above rates are as per the Rates charged by the main producers at their respective points of supply, as on the date of implementation of D.

Resolution Planning Department No. In Specific conditions if cofferdam, dsf etc. DSR Pune pwd civil work rates Documents.

  ESTANDAR ISO 9126 PDF

Copy attached in Pg. The floor to floor height of 4. Resolution Planning Department No.

Current Schedule Rates P.W.D. DSR/CSR 16-17 Pune, Maharastra, India

The cost per trip shown in statement C, also includes charges of running empty vehicle for return trip. D Structural Steel Rs.

Bd-F Deals with ssr rate of concrete for grid slab, this item should be used for grid slab only i. Bd-F Deals with the rate of 2012–13 for grid slab, this item should be used for grid slab only i. For following items of Bridge works the separate rate analysis shall be approved by the Territorial Superintending Engineer: Head load lead which is not to be deducted from lead and for other items the market rates are considered in the Statement A For National Highway works rates of state D.

The increase in rates as above should be on ground floor phne rates only. No cumulative increase shall be done.

Rubble, Metal, Sand, Murum etc. Sugarcane factory area 10 Km. C Tor Steel H. F High Tensile Steel Rs.